Work will resume for the White Flint Substation project Mon-Fri from 8:30am-3:30pm, with Saturday work as needed.  Flaggers will be on site to direct traffic and work will be covered with steel plates after hours.  

06/07/2021

Randolph Rd. Package B -Anchor– Backfill/Temporary asphalt- Continue excavation
Nebel St./White Flint Substation-Package C (CW & Sons Crew)– Continue excavation south on Nebel St.- Begin box tunnel towards substation- Install conduit
Nebel St. 500’ North of Old Georgetown-Package A (CW & Sons Crew)– Install conduit- Pour concrete- Backfill/Temporary asphalt

06/14/2021

Randolph Rd. Near Parklawn Dr.-Package B -Anchor– Continue excavation- Install conduit- Pour concrete
Nebel St./White Flint Substation-Package C (CW & Sons Crew)– Continue box tunnel- Pour concrete- Install 2” oil lines?
Nebel St. 500’ North of Old Georgetown-Package A (CW & Sons Crew)– Continue excavation- Install conduit