Catch up on Route 355 BRT

Catch up on Route 355 BRT

Curious about Bus Rapid Transit (BRT) on Route 355? Then attend one of the upcoming Route 355 BRT Open Houses to learn more about BRT and the project, including where and how the system could operate, potential station locations, and service options. The closest one to the White Flint area is in Bethesda on February 1.Details
Date:  February 1
Time:  7:00 pm – 9:00 pm
Date:   Bethesda-Chevy Chase High School Cafeteria , 4301 East-West Highway, Bethesda

Learn more about Bus Rapid Transit (BRT) at www.GetOnBoardBRT.com

Find out why BRT is:

Rapid: Features like limited stops, off-board fare collection, priority signaling, and level-boarding through all doors make for a faster ride.

Reliable: You’ll never wait long for the next BRT and will see real-time travel information at the station.

Relaxing: Avoid the stress associated with driving: use Wi-Fi to be more productive, read a book, or simply use the time to rest.

Amy Ginsburg

Website:

Leave a Reply

Your email address will not be published. Required fields are marked *